Dedicated and energetic individual, seeking an opportunity to become a productive part of an esteemed organization and work towards its growth and development.Dedicated and energetic individual, seeking an opportunity to become a productive part of an esteemed organization and work towards its growth and development.
SEPCO III- Power China 1230MW CCPP Thermal Power Plant Jhang, Pakistan
Trainee Engineer- Operations
Aug 2023 – Present
Haveli Bahadur Shah power plant is 1230 MW Combined Cycle Power Plant with two gas turbines 9ha.01 of General Electric and a triple pressure steam turbine.
PTW (Permit to Work) Issuing System
· Conducted comprehensive risk assessments to ensure safe work practices.
· Working on CMMS Maximo regarding work order tracking.
· Prepared and issued PTWs for various maintenance and repair activities.
· Verified compliance with PTW procedures and ensured proper authorization.
· Maintained accurate PTW records on Maximo and documentation.
Understanding Major Duties of Assistant Shift Engineer:
· Monitored and analyzed plant operating parameters to ensure optimal performance.
· Responded to alarms and operational issues promptly and effectively.
· Coordinated with maintenance personnel to resolve technical problems.
· Conducted routine inspections and preventive maintenance tasks.
· Communication with National Power Control Center regarding demand and load adjustments.
· Preparing daily operational report regarding different parameters of turbine.
Line Tracing:
· Traced mechanical systems to identify working and diving through deep concepts
· Prepared detailed reports documenting line tracing findings.
· Safety Activities:
· Attended safety audits and inspections to identify potential hazards.
· Developed and implemented safety procedures and training programs.
· Investigated and reported safety incidents to prevent recurrence.